PIDS – Project, Infrastructure & Deployment Services

Watch the video

Barron McCann – Delivering Service Excellence

Watch Now

Leading specialists in delivering new site, store openings, major rollouts and ongoing IMACs
(Installation, Moves Adds and Changes)

As one of the most experienced, quality-led operations in the UK, we provide a complete “End To End” solution for a wide range of clients in the retail and other sectors, for a range of technologies.

Our broad and extensive range of implementation and deployment services are designed to support you every step of the way with your –

  • IT & EPOS Systems
  • Payment Devices
  • Digital Signage
  • IP-CCTV
  • RF Network
  • Power, Data and Network Infrastructure

With the ever increasing need for industry compliance and security, we also routinely provide PCI-DSS P2PE compliant deployment services for PEDs.

6 REASONS TO CHOOSE BARRON MCCANN FOR YOUR NEXT PIDS PROJECT

  • All rollouts are project managed utilising Agile methodologies within a PRINCE2 framework by our own dedicated and highly experienced project services department.

  • Our PIDS department provides a totally managed service framework from acquisition and receipt of hardware into our secure storage area, build and configuration, through to on-site installation, commissioning, training and sign-off.   

  • Equipment is built and configured in our dedicated, purpose-built Configuration Centre, with specially designed staging points, enabling us to configure up to 800 IT / POS systems simultaneously.

  • Hardware systems are staged in our configuration centre and deployed and installed by Barron McCann’s own engineers, providing consistent and repeatable high quality installations across the UK and Europe. Our installation services engineers are managed centrally, and are cross-trained across a variety of disciplines, so we can offer the service quality, operational efficiency and cost benefits of a single team performing a range of onsite tasks.

  • Secure storage is provided for over 1,200 pallets of IT equipment, with overflow capacity for a further 500 pallets.  This includes PCI P2PE compliant storage to ISO 27001 Information Security requirements.  Engineers are served by a range of complementary logistics solutions. 

  • CSCS – All Barron McCann installations engineers carry current CSCS cards. CSCS is the leading skills certification scheme within the UK construction industry. CSCS cards provide proof that individuals working on construction sites have the required training and qualifications for the type of work they carry out.

    http://www.cscs.uk.com/

    PRINCE2 – PRINCE2 (an acronym for PRojects IN Controlled Environments) is a de facto process-based method for effective project management. At Barron McCann all our Project Managers are PRINCE2 accredited. Using PRINCE2 provides us greater control of resources, and the ability to manage business and project risk more effectively.

    https://www.prince2.com/uk

    IPAF – The International Powered Access Federation (IPAF) promotes the safe and effective use of powered access worldwide. Our engineers hold IPAF accreditations allowing us to use a variety of powered access devices to carry out our work.

    http://www.ipaf.org/en/

    PASMA – PASMA is the lead trade association for the mobile access tower industry. We hold current PASMA accreditations allowing us to use mobile access towers during the course of our work.

    https://www.pasma.co.uk/

    OUR CERTIFICATION

    Here at Barron McCann we pride ourselves on our ISO Certifications.

    We have held certification to ISO 9001 (formerly BS5750) since 1992 through the it’s various revisions and currently transitioning to ISO9001:2015.

    ISO27001:2005 Certification gained in 2011 and transitioned through to ISO27001:2013 is the other vital element that combines to form our Business Management System. Both Standards are externally verified by BSI. (British Standards Institute) biannually.    

    We’ve been independently assessed by BSI against Internationally recognized standards showing our commitment to quality and assurance.

    ISO 9001 Quality Management and ISO 27001 Information Security.

    bsi-and-ukasbsi-and-ukas

Total Managed Solution

By managing all aspects of the project our PIDS department can ensure consistent quality and the ability to manage and control costs, providing you with a total managed solution for your projects.

Read our Case Studies for details of recent PIDS projects.

Explore a service below

IT Procurement

Vendor Independent service, reporting on all aspects of performance, durability and design

Project Services

Employing one of the most experienced project management teams in the UK, focussed on delivering large scale and multi-site IT deployment.

Warehousing

Extensive Warehouse facilities, supporting the largest of IT Projects, Installations and Deployments

Stock Management

End to end stock management service

IT Build and Configuration Services

Fully integrated, dedicated build and configuration facility at our UK site

IT Installation and Deployment Services

Barron McCann’s PIDS team will manage every aspect of your project to minimise deployment-related downtime.